{"id":39702,"date":"2016-05-12T03:05:24","date_gmt":"2016-05-12T07:05:24","guid":{"rendered":"http:\/\/utnews.utoledo.edu\/?p=39702"},"modified":"2016-05-11T21:43:17","modified_gmt":"2016-05-12T01:43:17","slug":"bridge-construction-to-briefly-close-two-lots","status":"publish","type":"post","link":"https:\/\/news.utoledo.edu\/index.php\/05_12_2016\/bridge-construction-to-briefly-close-two-lots","title":{"rendered":"Bridge construction to briefly close two lots"},"content":{"rendered":"<p>Work on replacing the David Leigh Root Bridge on Stadium Drive on Main Campus will require closing two parking lots for a short time next week.<\/p>\n<p>Lot 10 north of the Glass Bowl is scheduled to close Monday through Wednesday, May 16-18. <\/p>\n<p><div id=\"attachment_39723\" style=\"width: 550px\" class=\"wp-caption alignright\"><a href=\"http:\/\/news.utoledo.edu\/?attachment_id=39723\" rel=\"attachment wp-att-39723\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-39723\" src=\"http:\/\/news.utoledo.edu\/wp-content\/uploads\/2016\/05\/web-bridge-construction-shot-by-Dan.jpg\" alt=\"Work continues on the new Root Bridge.\" width=\"540\" height=\"360\" class=\"size-full wp-image-39723\" srcset=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2016\/05\/web-bridge-construction-shot-by-Dan.jpg 540w, https:\/\/news.utoledo.edu\/wp-content\/uploads\/2016\/05\/web-bridge-construction-shot-by-Dan-300x200.jpg 300w\" sizes=\"(max-width: 540px) 100vw, 540px\" \/><\/a><p id=\"caption-attachment-39723\" class=\"wp-caption-text\">Work continues on the new Root Bridge.<\/p><\/div>In addition, Lot 11 behind Snyder Memorial Building is slated to be closed for the day on Wednesday, May 18.<\/p>\n<p>\u201cThe contractor will be setting the precast concrete pieces of the bridge during these days, so there will be heavy semi-truck traffic and crane movement associated with offloading and setting those members in place,\u201d\u00a0Christopher Levicki, UT manager of structural maintenance, said.<\/p>\n<p>\u201cWe are trying to keep these shutdowns as short as possible and apologize for the inconvenience,\u201d he said. \u201cWe appreciate everyone\u2019s patience.\u201d<\/p>\n<p>The new bridge is expected to open in August.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Due to bridge construction, two parking lots on Main Campus will be closed for a short time next week.<\/p>\n","protected":false},"author":17,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,7],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/39702"}],"collection":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/comments?post=39702"}],"version-history":[{"count":3,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/39702\/revisions"}],"predecessor-version":[{"id":39725,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/39702\/revisions\/39725"}],"wp:attachment":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/media?parent=39702"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/categories?post=39702"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/tags?post=39702"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}