{"id":48086,"date":"2018-01-17T03:54:55","date_gmt":"2018-01-17T07:54:55","guid":{"rendered":"http:\/\/utnews.utoledo.edu\/?p=48086"},"modified":"2018-01-16T15:55:36","modified_gmt":"2018-01-16T19:55:36","slug":"lane-closures-expected-as-work-on-bancroft-street-to-continue","status":"publish","type":"post","link":"https:\/\/news.utoledo.edu\/index.php\/01_17_2018\/lane-closures-expected-as-work-on-bancroft-street-to-continue","title":{"rendered":"Lane closures expected as work on Bancroft Street to continue"},"content":{"rendered":"<p>Crews are scheduled to begin relocating and installing a gas line on West Bancroft Street this week.<\/p>\n<p>The work will require some lane restrictions during the day, but two-way traffic will be maintained during the project.<\/p>\n<p><a href=\"http:\/\/news.utoledo.edu\/?attachment_id=48090\" rel=\"attachment wp-att-48090\"><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/news.utoledo.edu\/wp-content\/uploads\/2018\/01\/gas-installation-map-of-Bancroft.png\" alt=\"\" width=\"540\" height=\"428\" class=\"alignright size-full wp-image-48090\" srcset=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2018\/01\/gas-installation-map-of-Bancroft.png 540w, https:\/\/news.utoledo.edu\/wp-content\/uploads\/2018\/01\/gas-installation-map-of-Bancroft-300x238.png 300w\" sizes=\"(max-width: 540px) 100vw, 540px\" \/><\/a>Miller Pipeline will be working on Bancroft between Audubon Place and Cheltenham Road.<\/p>\n<p>The project will continue through April to align with the city of Toledo\u2019s street improvement project, which is scheduled to start in the spring.<\/p>\n<p>\u201cWe will keep the campus community up to date on this work and the project in the spring,\u201d Doug Collins, director of grounds and transportation, said. <\/p>\n<p>\u201cIn the meantime, we want to remind drivers to slow down,\u201d\u00a0he said. \u201cWe ask everyone to be patient, drive slowly, and be aware of pedestrians and workers.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The installation of a new gas line on West Bancroft Street will cause some lane restrictions during the day, but two-way traffic will be maintained.<\/p>\n","protected":false},"author":17,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,1,7],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/48086"}],"collection":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/comments?post=48086"}],"version-history":[{"count":3,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/48086\/revisions"}],"predecessor-version":[{"id":48091,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/48086\/revisions\/48091"}],"wp:attachment":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/media?parent=48086"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/categories?post=48086"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/tags?post=48086"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}