{"id":80445,"date":"2023-05-25T04:00:00","date_gmt":"2023-05-25T08:00:00","guid":{"rendered":"https:\/\/news.utoledo.edu\/?p=80445"},"modified":"2023-05-30T08:43:30","modified_gmt":"2023-05-30T12:43:30","slug":"throwback-thursday-30","status":"publish","type":"post","link":"https:\/\/news.utoledo.edu\/index.php\/05_25_2023\/throwback-thursday-30","title":{"rendered":"Throwback Thursday"},"content":{"rendered":"<p>Works Progress Administration workers take a lunch break during construction of the Field House \u2014 later renamed Memorial Field House \u2014 in 1930. A WPA crew of 400 men built the Field House and University Hall in 11 months, with both buildings opening the University\u2019s \u201cnew campus\u201d on Bancroft Street in February 1931.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-80470\" src=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2023\/05\/Throwback-Thursday-Field-House-WPA-workers-copy.jpg\" alt=\"Works Progress Administration workers take a lunch break during construction of the Field House \u2014 later renamed Memorial Field House \u2014 in 1930.\" width=\"500\" height=\"281\" srcset=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2023\/05\/Throwback-Thursday-Field-House-WPA-workers-copy.jpg 748w, https:\/\/news.utoledo.edu\/wp-content\/uploads\/2023\/05\/Throwback-Thursday-Field-House-WPA-workers-copy-300x169.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<a href=\"https:\/\/news.utoledo.edu\/index.php\/05_25_2023\/throwback-thursday-30\"><img width=\"120\" height=\"120\" src=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2023\/05\/Throwback-Thursday-Field-House-WPA-workers-copy-150x150.jpg\" class=\"alignright tfe wp-post-image\" alt=\"Works Progress Administration workers take a lunch break during construction of the Field House \u2014 later renamed Memorial Field House \u2014 in 1930.\" decoding=\"async\" loading=\"lazy\" \/><\/a><p>Works Progress Administration workers take a lunch break during construction of the Field House \u2014 later renamed Memorial Field House \u2014 in 1930. A WPA crew of 400 men built the Field House and University Hall in 11 months, with both buildings opening the University\u2019s \u201cnew campus\u201d on Bancroft Street in February 1931.<\/p>\n","protected":false},"author":17,"featured_media":80470,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[348,50,1,298],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/80445"}],"collection":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/comments?post=80445"}],"version-history":[{"count":3,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/80445\/revisions"}],"predecessor-version":[{"id":80471,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/80445\/revisions\/80471"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/media\/80470"}],"wp:attachment":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/media?parent=80445"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/categories?post=80445"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/tags?post=80445"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}