{"id":97479,"date":"2026-03-06T04:00:44","date_gmt":"2026-03-06T08:00:44","guid":{"rendered":"https:\/\/news.utoledo.edu\/?p=97479"},"modified":"2026-03-09T08:47:41","modified_gmt":"2026-03-09T12:47:41","slug":"welcome-center-construction-update","status":"publish","type":"post","link":"https:\/\/news.utoledo.edu\/index.php\/03_06_2026\/welcome-center-construction-update","title":{"rendered":"Welcome Center Construction Update"},"content":{"rendered":"<p>Construction of UToledo\u2019s new welcome center and one-stop center, located off Bancroft Street and connected to Scott and Tucker Halls, is progressing on schedule, with steel framing for the new addition placed this week. The project\u2019s completion is planned for this summer, with move-in scheduled before the start of fall semester.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-97480\" src=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2026\/03\/03042026-7452.jpg\" alt=\"Construction of UToledo\u2019s new welcome center and one-stop center, located off Bancroft Street and connected to Scott and Tucker Halls, is progressing on schedule, with steel framing for the new addition placed this week. The project\u2019s completion is planned for this summer, with move-in scheduled before the start of fall semester.\u00a0\" width=\"500\" height=\"281\" srcset=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2026\/03\/03042026-7452.jpg 748w, https:\/\/news.utoledo.edu\/wp-content\/uploads\/2026\/03\/03042026-7452-300x169.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<p>The welcome center will provide a \u201cfront door\u201d to the University, relocating student support services \u2014 the bursar\u2019s office, financial aid, the registrar\u2019s office and the military services center \u2014 closer to the heart of campus. Additionally, it will serve as the new location to welcome prospective Rockets and their families to campus before they take a campus tour.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-97481\" src=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2026\/03\/03042026-3467.jpg\" alt=\"Construction worker sands steel framing on the new welcome center and one-stop center.\" width=\"500\" height=\"281\" srcset=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2026\/03\/03042026-3467.jpg 748w, https:\/\/news.utoledo.edu\/wp-content\/uploads\/2026\/03\/03042026-3467-300x169.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<a href=\"https:\/\/news.utoledo.edu\/index.php\/03_06_2026\/welcome-center-construction-update\"><img width=\"120\" height=\"120\" src=\"https:\/\/news.utoledo.edu\/wp-content\/uploads\/2026\/03\/03042026-7452-150x150.jpg\" class=\"alignright tfe wp-post-image\" alt=\"Construction of UToledo\u2019s new welcome center and one-stop center, located off Bancroft Street and connected to Scott and Tucker Halls, is progressing on schedule, with steel framing for the new addition placed this week. The project\u2019s completion is planned for this summer, with move-in scheduled before the start of fall semester.\u00a0\" decoding=\"async\" loading=\"lazy\" \/><\/a><p>Construction of UToledo\u2019s new welcome center and one-stop center, located off Bancroft Street and connected to Scott and Tucker Halls, is progressing on schedule, with steel framing for the new addition placed this week. The project\u2019s completion is planned for this summer.\u00a0<\/p>\n","protected":false},"author":17,"featured_media":97480,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[50,1,7],"tags":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/97479"}],"collection":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/comments?post=97479"}],"version-history":[{"count":2,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/97479\/revisions"}],"predecessor-version":[{"id":97492,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/posts\/97479\/revisions\/97492"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/media\/97480"}],"wp:attachment":[{"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/media?parent=97479"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/categories?post=97479"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/news.utoledo.edu\/index.php\/wp-json\/wp\/v2\/tags?post=97479"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}